SNiP

1962

SNiP II-G.5-62
SNiP II-G.5-62
Internal sewage of industrial and auxiliary buildings of industrial enterprises. Design Standards
SNiP II-G.6-62
SNiP II-G.6-62
Sewage. Design Standards
SNiP II-G.7-62
SNiP II-G.7-62
Heating, ventilation and air conditioning. Design Standards
SNiP II-G.8-62
SNiP II-G.8-62
Hot water supply. Design Standards
SNiP II-I.1-62
SNiP II-I.1-62
Waterworks river. Basic design provisions
SNiP II-I.2-62
SNiP II-I.2-62
Marine marine structures. Basic design provisions
SNiP II-I.3-62
SNiP II-I.3-62
Constructions of meliorative systems. Design Standards
SNiP II-I.4-62
SNiP II-I.4-62
Dam earthen bulk. Design Standards
SNiP II-I.5-62
SNiP II-I.5-62
Alluvial dams. Design Standards
SNiP II-I.6-62
SNiP II-I.6-62
Stones dam. Design Standards
SNiP II-I.8-62
SNiP II-I.8-62
Thermal power plants. Design Standards
SNiP II-I.9-62
SNiP II-I.9-62
Power lines with voltage above 1 kV. Design Standards
SNiP III-A.10-62
SNiP III-A.10-62
Commissioning of completed enterprises, buildings and structures. Main provisions
SNiP III-A.11-62
SNiP III-A.11-62
Safety in construction
SNiP III-A.1-62
SNiP III-A.1-62
Organization and technology of construction production. a common part
SNiP III-A.2-62
SNiP III-A.2-62
Industrialization of construction. Main provisions
SNiP III-A.3-62
SNiP III-A.3-62
Duration of construction of enterprises, launch complexes, workshops, buildings and structures
SNiP III-A.4-62
SNiP III-A.4-62
Complex of mechanization and automation in construction. Main provisions
SNiP III-A.5-62
SNiP III-A.5-62
Organization of material and technical facilities. Main provisions
SNiP III-A.6-62
SNiP III-A.6-62
Organizational and technical preparation for construction. Main provisions
SNiP III-A.7-62
SNiP III-A.7-62
Labor Organization. Main provisions
SNiP III-A.8-62
SNiP III-A.8-62
Operational planning and scheduling. The main provisions and rules
SNiP III-B.10-62
SNiP III-B.10-62
Construction on subsurface soils. Rules of organization, production and acceptance of work
SNiP III-B.1-62
SNiP III-B.1-62
Earthworks. General rules for the production and acceptance of work
SNiP III-B.2-62
SNiP III-B.2-62
Earthworks. Rules of production and acceptance of hydromechanized and dredging works
SNiP III-B.3-62
SNiP III-B.3-62
Open drainage and artificial lowering of the groundwater level. Rules of production and acceptance of work
SNiP III-B.4-62
SNiP III-B.4-62
Earthworks. Blasting work. Rules of production and acceptance of work
SNiP III-B.5-62
SNiP III-B.5-62
Stabilization and artificial fixation of soils. Rules of organization, production and acceptance of work
SNiP III-B.6-62
SNiP III-B.6-62
Foundations and supports from piles and shells. Sheet piling. Rules of production and acceptance of work
SNiP III-B.7-62
SNiP III-B.7-62
Sinkholes and caissons. Rules of production and acceptance of work
SNiP III-B.9-62
SNiP III-B.9-62
Underground mine workings of mining companies. Rules of production and acceptance of work
SNiP III-D.10-62
SNiP III-D.10-62
Main pipelines. Rules for the organization of construction, work and acceptance into operation
SNiP III-D.11-62
SNiP III-D.11-62
Aerodrome Facilities. Rules for the organization of construction, production and acceptance of work
SNiP III-D.1-62
SNiP III-D.1-62
Railways. Rules for the organization of construction and commissioning
SNiP III-D.2-62
SNiP III-D.2-62
Bridges and pipes. Rules of the organization and work. Commissioning
SNiP III-D.4-62
SNiP III-D.4-62
1524-mm Gauge Street Car Tracks. Requirements for Management of Construction, Work Execution, and Acceptance
SNiP III-D.5-62
SNiP III-D.5-62
Car roads. Rules for the organization of construction and work. Commissioning
SNiP III-D.9-62
SNiP III-D.9-62
Contact Networks for Electrically Powered Transport
SNiP III-E.1-62
SNiP III-E.1-62
Communications, broadcasting and television facilities. General provisions of the organization of construction and commissioning
SNiP III-E.3-62
SNiP III-E.3-62
Long-distance wired communication station facilities. Rules for the production of installation and commissioning
SNiP III-E.4-62
SNiP III-E.4-62
Transmitting and receiving radio stations. Rules for the production of installation and commissioning
SNiP III-G.10.1-62
SNiP III-G.10.1-62
Handling equipment. Rules of production and acceptance of installation works
SNiP III-G.10.2-62
SNiP III-G.10.2-62
Compressors. Rules of production and acceptance of installation works
SNiP III-G.10.3-62
SNiP III-G.10.3-62
Pumps. Rules of production and acceptance of installation works
SNiP III-G.10.5-62
SNiP III-G.10.5-62
Crushing, grinding, sorting, processing and sintering equipment. Rules of production and acceptance of installation works
SNiP III-G.10-62
SNiP III-G.10-62
Technological equipment. General rules for the production and acceptance of installation work
SNiP III-G.11-62
SNiP III-G.11-62
Heating stoves, smoke and ventilation ducts of residential and public buildings. Rules of production and acceptance of work
SNiP III-G.12-62
SNiP III-G.12-62
Laying industrial furnaces and brick chimneys. Rules of production and acceptance of work