Protection of underground structures against stray current corrosion by polarized protectors. Technical requirements
|
System of design documentation for construction. Rules for execution of design documentation of heating, ventilation, air conditioning systems and heat networks
|
Buildings and civil engineering works. Vocabulary. Part 1. General terms
|
Engineering survey. Requirements for the maintenance and execution of field documentation when driving and testing engineering and geological workings
|
Technological engineering and design. Feasibility study of an investment project of an industrial facility. General requirements.
|
Process engineering and design. Comprehensive analysis of potential hazards in the design of the facility. General provisions
|
Landscape architecture of territories of urban and rural settlements. Terms and definitions
|
System of product development and launching into manufacture. Development and launching into manufacture procedure of measuring instruments in USSR Minstroymaterial system.
|
System of product development and launching into manufacture. Devices and an automation equipment of technological processes in the construction material industry. Carrying out procedure for research works, development works and exploitation of industrial production.
|
System of product development and launching into manufacture. Carrying out procedure of patent researches at construction, road, municipal machine and equipment development.
|
external heat exchange device and devices for internal vessels and apparatuses. Types, design, dimensions and Technical requirements .
|
|